ADS Installation at Odell Illinois

In June of 2009 ADS completed a project to upgrade an existing WWTP lagoon at Odell, IL. The primary lagoon was initially too large so an earthen dike was constructed to minimize the size of this lagoon and the equipment needed to treat the wastewater.